What is the lead time for Coffee Machine tamper & portafilter lug samples vs production?

Update Time:2026/9/6

Realistic numbers

For Coffee Machine tamper & portafilter lug, samples typically run faster than volume because we skip queueing for raw stock. LusterControl targets 7-day first article from drawing to sample for many programs, and 3-day express for small trial/sample batches.

Buyer tips to shorten it

  • Send a clean 2D+3D drawing and the real annual volume.
  • Confirm material early so we reserve stock.
  • Book the DFM review before PO to avoid rework loops.

Low-moq prototyping and a fast path to first articles.